KC ENGINEERED SEPTIC — PROPERTY PLANNING WORKSHEET Prepared September 19, 2026 https://kcengineeredseptic.com/project-planner/ Parcel / county / city limits: Governing office and confirmation date: Project: new home / full replacement / land purchase / other Current and proposed bedrooms: Soil evaluation date and location: Existing system records: Site drawing and future improvements: Power, access, rock, slope or drainage questions: Design preparer and installer responsibilities: Permits and inspection stages: Included / excluded / allowance items: Final records and homeowner walk-through: Do not enter tanks or excavations. This worksheet is a planning aid, not an approved design.